New double socket with USB charging installed during a house rewire

NICEIC Approved Contractor · Reg 041430

Socket installationin Congleton, fitted neatly,tested and certificated

Extra sockets where you actually need them, tired ones replaced, and outdoor points added, with the plaster and paintwork left as tidy as we found it. Free quote, fixed price agreed in advance, no deposit required.

4.8 from 58 Google reviews · NICEIC Approved Contractor 041430 · Tidy finish, guaranteed in writing by our reviews

NICEIC Approved

Contractor registration 041430

Every job quoted first

Including small jobs: free, before work starts

18th Edition

Tested and certificated to current standards

£5m public liability

Fully insured on every visit

The service

What socket work covers

Socket work ranges from swapping a cracked faceplate to adding new points on a circuit that has to be assessed first. What they have in common is that they are all part of a live installation: a socket added to a circuit that is already loaded, or spurred from the wrong point, becomes a problem rather than a convenience.

Amara fits extra sockets, replaces damaged or dated accessories, relocates points that ended up in the wrong place after a kitchen or furniture change, adds USB and USB-C sockets, and installs weatherproof outdoor sockets for garden equipment, hot tubs and Christmas lighting.

The finish matters as much as the electrics. Cables are chased and buried properly where they should be, boxes are set flush, and plaster and paintwork are left tidy. That is the single most repeated point in Amara's Google reviews.

Every job is quoted before work starts, including the small ones, and the work is tested and certificated on completion by a NICEIC Approved Contractor.

Who it is for

  • Homes living on extension leads

    Trailing four-ways behind the TV or under a desk are a sign the room is short of sockets, not that you need another adaptor.

  • Kitchens and home offices

    Worktop appliances and desk equipment both concentrate demand in one place, which is where the circuit needs assessing rather than extending blind.

  • Damaged and dated accessories

    Cracked, loose, scorched or discoloured faceplates are not cosmetic problems; they are the visible end of a connection issue.

  • Gardens, garages and outbuildings

    Outdoor and garage power needs weatherproof accessories and correct protection, not an internal socket in a shed.

What it costs to leave it

What happens when sockets are added the wrong way

Adding a socket is the job most often done badly, because it looks like the simplest thing in the house. The circuit behind it decides whether it is safe.

Overloaded circuits

Extra points added without assessing the existing load put a circuit permanently near its limit, which shows up as nuisance tripping or, worse, heat.

Overheating extension leads

Multi-way adaptors running heaters, kettles or tumble dryers are a recognised fire risk. The fix is a socket, not another adaptor.

Scorched and loose faceplates

Discolouration or warmth around a socket means a poor connection arcing behind it. That deteriorates every time the socket is used.

Badly spurred additions

Spurs taken from the wrong point, or spurs off spurs, leave the circuit outside the design it was tested to.

Cables run where nobody expects them

Cable buried outside the permitted zones is invisible until someone puts a picture hook or a shelf bracket through it.

Outdoor sockets that are not outdoor sockets

An unrated accessory outside fills with water, corrodes and eventually trips the circuit, often taking half the house with it on an older board.

Common mistakes we get called out to fix

  • Adding sockets without checking what the existing circuit is already carrying
  • Spurring off an existing spur to save running a new cable
  • Using an indoor socket in a garage, shed or porch
  • Burying cable outside the permitted zones so future DIY hits it
  • Replacing a scorched socket without investigating why it scorched
  • Leaving the job without the accessory being tested or certificated

Our process

How the job runs,
start to certificate

  1. 01

    Tell us what you need and where

    How many points, which rooms, and what will be plugged into them. That determines whether it is an addition to an existing circuit or a new one.

  2. 02

    Free quote before any work

    Every job is quoted before work starts, including small ones. Fixed price agreed in advance and no deposit required.

  3. 03

    Circuit checked first

    The existing circuit and consumer unit are checked for capacity and protection so the addition is designed rather than assumed.

  4. 04

    Installation

    Cable run and buried within the permitted zones, boxes set flush and square, accessories fitted level, plaster made good.

  5. 05

    Testing

    The circuit is tested to 18th Edition standards after the alteration, with the results recorded, before it goes back into service.

  6. 06

    Certification and tidy up

    Certification issued for the work, and the room left clean, the point Amara's reviewers mention most often.

What you get

The difference it makes
once the work is done

No more extension leads

Power where you actually use it, removing the trailing adaptors that are the real fire risk in most rooms.

The circuit assessed, not assumed

Capacity and protection checked before anything is added, so the new point does not become the reason the circuit trips.

A finish you do not have to fix

Chased, buried, flush and made good. Reviewers repeatedly mention the house being left tidy.

Safe outdoor power

Weatherproof accessories with the correct protection for garden equipment, garages and outbuildings.

Small jobs taken seriously

Quoted before work starts and certificated afterwards, whether it is one socket or a whole room.

Certificated and insured

NICEIC Approved Contractor 041430, 18th Edition, £5,000,000 public liability insurance.

In detail

Socket types, circuits and installation detail

The right answer depends on the room, the circuit and what is being plugged in. These are the variables that get decided on the day.

Single, double and USB sockets

Doubles are the sensible default almost everywhere: the cost difference over a single is negligible and it halves the chance of an extension lead appearing later. USB and USB-C integrated sockets are now standard in bedrooms, kitchens and home offices, and remove the charger clutter from the worktop.

Finish is a genuine choice: white moulded, brushed steel, matt black and screwless variants all fit the same back boxes, and the depth of the back box matters more than the faceplate when it comes to a flush, square fit.

  • Double sockets as standard over singles
  • Integrated USB-A and USB-C for bedrooms, kitchens and offices
  • Switched and unswitched fused connection units for fixed appliances
  • Brushed steel, matt black and screwless finishes
Ring circuits, radials and spurs

Most UK socket circuits are rings; some, particularly in newer or partially rewired properties, are radials. Extending either requires knowing which you have, what protective device serves it and how much of the property it already covers.

A fused spur is a legitimate way to add a point in the right circumstances. Spurring off an existing spur, or adding several unfused spurs to a ring, is not, and it is one of the most common defects found during an EICR.

Kitchens and high-demand areas

Kitchens concentrate the heaviest domestic loads into a few metres of worktop: kettle, toaster, microwave, air fryer, dishwasher, washing machine. Adding sockets here without assessing the circuit is how a nuisance-tripping kitchen is created.

Fixed appliances are best supplied through switched fused connection units with accessible isolation, so the machine can be isolated without dragging it out of its housing.

Outdoor and garage sockets

Outdoor sockets must be weatherproof rated, positioned clear of standing water, and protected appropriately. Where a garage or outbuilding needs more than an occasional point, a dedicated supply with its own protection is usually the better answer than extending an internal circuit.

Hot tubs, garden offices and workshops have real, sustained loads and are treated as their own installation rather than an added socket.

  • Weatherproof rated accessories, correctly positioned
  • Appropriate protection for outdoor circuits
  • Dedicated supplies for garages, workshops and garden offices
  • Hot tub supplies assessed on their actual load
Cable routes, zones and making good

Buried cable runs in permitted zones: vertically and horizontally from the accessory, and around the perimeter, so anyone drilling later has a reasonable expectation of where cables are. Where a chase is not practical, surface trunking is used and run straight and level rather than draped.

Making good is part of the job. Boxes set flush, chases filled, dust controlled and the room left clean. It is the single most repeated compliment in the reviews and it is deliberate.

Replacing a socket that has overheated

A scorched or discoloured socket is replaced, but the more important question is why. Loose terminals, an overloaded circuit or a failing appliance all produce the same mark, and only one of them is fixed by a new faceplate.

Where heat damage is found, the connections either side are checked and the circuit tested. If the same pattern appears at several accessories, that points towards an EICR rather than a series of replacements.

When it is time for a new circuit or a rewire

If a room needs several new points, or the existing circuit is already at its limit, a new dedicated circuit from the board is often cheaper and better than repeatedly extending. Where the property still has original cabling or a rewireable fuse board, the socket job is a good moment to have the whole installation assessed.

Areas covered

Socket installation is carried out across Congleton and the wider Cheshire area, plus Manchester, Stoke-on-Trent, Stockport, Cheadle, Wilmslow, Altrincham and Crewe.

Common questions

Sockets
questions answered

Anything not covered here, call Mike on 07946 541693.

How much does it cost to add a socket?+

It depends on the run, the wall construction and whether the circuit can take it. Every job is quoted before work starts, including small ones. Quotes are free, the price is fixed in advance and no deposit is required.

How long does fitting extra sockets take?+

A straightforward addition is often an hour or two; several points across a room, or a new dedicated circuit, is usually a half or full day. You are told the expected duration when the work is quoted.

Will you make a mess of the plaster?+

Chases are cut cleanly, boxes set flush and plaster made good, with dust kept under control. Being left tidy is the most frequently repeated point in Amara's Google reviews.

Can you fit sockets without chasing the walls?+

Often, yes: running through voids, from above or below, or in surface trunking where a chase is not practical. The route is agreed with you before work starts.

How many sockets can be on one circuit?+

There is no simple number: it depends on the circuit type, the protective device and, most importantly, what is actually plugged in. That is why the circuit is assessed before points are added rather than after.

Do I get a certificate for socket work?+

Yes. The circuit is tested to 18th Edition standards after the alteration and certification is issued for the work. Certain products and components carry a 12-month manufacturer warranty.

One of my sockets is warm and discoloured, is that urgent?+

Yes. That indicates a poor connection arcing behind the faceplate, which is a fire risk. Stop using it and call Mike. Fault-finding is charged at an hourly rate, made clear before we attend.

Can you fit an outdoor socket for the garden or a hot tub?+

Yes. Outdoor points use weatherproof rated accessories with appropriate protection. Hot tubs and garden offices have sustained loads and are assessed as their own supply rather than an added socket.

How long should a socket last?+

A quality accessory in normal use lasts many years, but sockets in constant use, in kitchens, or feeding heavy loads wear faster. Periodic inspection, an EICR every ten years for owner-occupied homes, five for rented, is what catches deterioration.

Do you do socket work outside Congleton?+

Yes, across the wider Cheshire area plus Manchester, Stoke-on-Trent, Stockport, Cheadle, Wilmslow, Altrincham and Crewe.

Next step

Get power where you actually need it

Tell Mike which rooms and how many points and he will quote it free, before any work starts. Fixed price agreed in advance, no deposit, and the place left tidy.

07946 541693
  • NICEIC Approved Contractor, registration 041430
  • £5,000,000 public liability insurance
  • Free quotes, no deposit required
  • 4.8★ from 58 Google reviews

Mon–Fri 8am–7pm · Sat 9am–3pm

Accredited, approved and independently reviewed

  • NICEIC Approved Contractor, registration 041430
  • OZEV approved installer, Office for Zero Emission Vehicles
  • Checkatrade member
Call Mike Free Quote